J Environ Manage. 2021 Jan 1;277:111474. doi: 10.1016/j.jenvman.2020.111474. Epub 2020 Oct 8.

Abstract

Blantyre, Malawi has approximately one million people who rely on pit latrines for sanitation and yet there is a limited pit-emptying sector to empty, transport and safely discharge the faecal sludge. Over three years, we monitored the volume of sludge that was safely discharged at the authorized Wastewater Treatment Plants (WWTP) and in parallel, estimated the volume of sludge that is currently buried within pit latrines of Blantyre, based on measurements at 321 households. Comparing the volumes of sludge emptied to the volumes of sludge buried, we highlight the fact that a) there is a suspiciously low volume of pit-derived faecal sludge being safely disposed; b) most safely discharged sludge is taken from the small proportion of septic tanks in the city, and not from pit latrines; and c) that the cost of safely discharging does not seem to correlate with the volumes delivered (despite an option to discharge for free). There is a large and growing amount of sludge buried beneath the city which will need to be safely emptied and treated in coming years. The city and the WWTPs must move quickly to ensure that the businesses and infrastructure are prepared for the future faecal sludge management challenges that lay ahead, especially if they are to achieve SDG 6 by 2030.

摘要

马拉维布兰太尔约有 100 万人依赖坑式厕所进行卫生处理,但清空、运输和安全排放粪便污泥的坑式厕所清空部门有限。在三年的时间里,我们监测了在授权的废水处理厂(WWTP)安全排放的污泥量,并根据对 321 户家庭的测量,同时估算了目前埋在布兰太尔坑式厕所中的污泥量。将清空的污泥量与埋在地下的污泥量进行比较,我们发现了以下事实:a)安全处理的坑式厕所产生的粪便污泥量可疑地低;b)大部分安全排放的污泥来自城市中一小部分化粪池,而不是来自坑式厕所;c)安全排放的成本似乎与交付的量无关(尽管有免费排放的选择)。城市下面有大量且不断增加的污泥需要在未来几年内安全清空和处理。城市和 WWTP 必须迅速采取行动,确保企业和基础设施为未来的粪便污泥管理挑战做好准备,特别是如果他们要在 2030 年前实现可持续发展目标 6 的话。