Köppl B, Piloty M
Bezirksamt Steglitz von Berlin, Abt. Gesundheit und Umweltschutz-Umweltamt.
Gesundheitswesen. 1993 Dec;55(12):629-34.
A general survey of the procedure of the restoration of a school building is presented. The effects of several measures (i.e. ventilation) and restoration steps as well of problems of removal of PCB containing materials and financial charges are discussed and evaluated. It was possible to reduce the indoor air contamination below the value of 300 ng/m3 by removal of the PCB-containing sealants and sealing the secondary contaminated walls with appropriate materials.
本文介绍了一所学校建筑修复过程的总体概况。讨论并评估了若干措施(如通风)和修复步骤的效果,以及含多氯联苯材料的清除问题和财务费用。通过清除含多氯联苯的密封剂并用适当材料密封二次污染的墙壁,有可能将室内空气污染降低到300纳克/立方米以下。