Suppr超能文献

大规模停电对血液透析中心运营的影响。

The impact of a large-scale power outage on hemodialysis center operations.

机构信息

1 George Washington University, Department of Emergency Medicine, Washington, DC USA and RAND Corporation, Arlington, Virginia USA.

出版信息

Prehosp Disaster Med. 2013 Dec;28(6):543-6. doi: 10.1017/S1049023X13008844. Epub 2013 Aug 22.

Abstract

INTRODUCTION

On June 29, 2012, mid-Atlantic storms resulted in a large-scale power outage affecting up to three million people across multiple (US) states. Hemodialysis centers are dependent on electricity to provide dialysis care to end-stage renal disease patients. The objective of this study was to determine how the power outage impacted operations in a sample of hemodialysis centers in the impacted regions.

METHODS

The sample consisted of all hemodialysis centers located in the District of Columbia and a total of five counties with the largest power losses in West Virginia, Virginia, and Maryland. A semi-structured interview guide was developed, and the charge nurse or supervisor in each facility was interviewed. The survey questions addressed whether their centers lost power, if so, for how long, where their patients received dialysis, whether their centers had backup generators, and if so, whether they had any problems operating them, and whether their center received patients from other centers if they had power.

RESULTS

Calls were placed to 90 dialysis centers in the sampled areas and a 90% response rate was achieved. Overall, hemodialysis operations at approximately 30% (n = 24) of the centers queried were impacted by the power outage. Of the 36 centers that lost power, 31% (n = 11) referred their patients to other dialysis centers, 22% (n = 8) accommodated their patients during a later shift or on a different day; the rest of the centers either experienced brief power outages that did not affect operations or experienced a power outage on days that the center is usually closed. Some centers in the study cohort reported receiving patients from other centers for dialysis 33% (n = 27). Thirty-two percent (n = 26) of the centers queried had backup generators on site. Eleven percent (n = 4) of the centers experiencing power outages reported that backup generators were brought in by their parent companies.

CONCLUSIONS

Comprehensive emergency planning for dialysis centers should include provisions for having backup generators on site, having plans in place for the timely delivery of a generator during a power outage, or having predesignated backup dialysis centers for patients to receive dialysis during emergencies. Most dialysis centers surveyed in this study were able to sustain continuity of care by implementing such pre-existing emergency plans.

摘要

简介

2012 年 6 月 29 日,大西洋中部地区的风暴导致大规模停电,影响了美国多个州的多达 300 万人。血液透析中心依赖电力为终末期肾病患者提供透析护理。本研究的目的是确定停电对受影响地区部分血液透析中心运营的影响。

方法

该样本由位于哥伦比亚特区的所有血液透析中心和西弗吉尼亚州、弗吉尼亚州和马里兰州中电力损失最大的五个县的五个县的所有血液透析中心组成。制定了一份半结构化访谈指南,并对每个设施的护士长或主管进行了访谈。调查问题涉及他们的中心是否停电,如果是,停电时间有多长,他们的患者在哪里接受透析,他们的中心是否有备用发电机,如果有,他们在操作发电机时是否有任何问题,以及他们的中心是否接收其他中心的患者,如果有电力。

结果

对抽样地区的 90 家透析中心进行了电话访问,获得了 90%的回复率。总的来说,约 30%(n=24)的被调查中心的血液透析业务受到停电的影响。在 36 家停电的中心中,31%(n=11)将患者转介到其他透析中心,22%(n=8)在稍后的班次或不同的日子为患者提供服务;其余中心要么经历了短暂的停电,没有影响运营,要么在中心通常关闭的日子经历了停电。研究队列中的一些中心报告说,他们接收了来自其他中心的患者进行透析,占 33%(n=27)。被调查的中心中有 32%(n=26)有现场备用发电机。11%(n=4)的停电中心报告说,备用发电机是由其母公司提供的。

结论

透析中心的全面应急计划应包括现场备用发电机的规定,在停电期间及时提供发电机的计划,或为患者在紧急情况下提供指定的备用透析中心。在这项研究中调查的大多数透析中心都能够通过实施这些现有的应急计划来维持护理的连续性。