Center for Earth Observations and Global Change, Michigan State University, East Lansing, MI, United States of Ameica.
Center for Environmental Studies and Research-Nepam, State University of Campinas, Campinas, SP, Brazil.
PLoS One. 2023 Jul 14;18(7):e0284760. doi: 10.1371/journal.pone.0284760. eCollection 2023.
Large hydropower projects continue to be built in developing nations, despite their known negative impacts. Large-scale energy projects strain local infrastructure and reduce access to infrastructure for households that live near them. Here we investigate the link between large-scale hydropower projects and stress. Our results suggest that these projects create stress through two mechanisms: strains on community resources and through the process of displacement. We also ask how compensation and resettlement programs condition these relationships. Using data from the Madeira river basin in the Brazilian Amazon, we find that hydropower projects increase stress by reducing access to energy, water, sanitation and land. Compensation provided was not sufficient to moderate this effect.
尽管大型水电项目的负面影响众所周知,发展中国家仍在继续建设此类项目。大型能源项目会给当地基础设施带来压力,并减少附近居民获得基础设施的机会。在此,我们研究了大型水电项目与压力之间的联系。我们的研究结果表明,这些项目通过两种机制产生压力:社区资源紧张和移民搬迁过程。我们还探讨了补偿和安置计划如何影响这些关系。我们使用巴西亚马逊地区马德拉河流域的数据,发现水电项目通过减少能源、水、卫生和土地的获取来增加压力。提供的补偿不足以缓解这种影响。