Fusion is inherently safer than fission due to the absence of nuclear chain reactions. However, operating fusion power plants will not be risk free. There will still be numerous hazards that will need careful management in order to safely build, operate and ultimately decommission a fusion power plant. Ensuring a robust safety demonstration that covers all radiological and non-radiological hazards is therefore vitally important for the future permissioning and consenting of fusion power plants. The safety case for the STEP prototype plant will be developed in line with a set of safety philosophies, safety functional requirements and design safety principles to ensure that the safety case production process is consistent and robust.This article is part of the theme issue 'Delivering Fusion Energy - The Spherical Tokamak for Energy Production (STEP)'.
由于不存在核链式反应,核聚变本质上比核裂变更安全。然而,运行核聚变发电厂并非毫无风险。仍然会有许多危害,为了安全地建造、运行并最终退役一座核聚变发电厂,需要对这些危害进行仔细管理。因此,确保涵盖所有辐射和非辐射危害的有力安全论证对于未来核聚变发电厂的许可和批准至关重要。国际热核聚变实验堆(ITER)小型示范堆(STEP)原型厂的安全论证将根据一系列安全理念、安全功能要求和设计安全原则来制定,以确保安全论证的制定过程是一致且有力的。本文是主题为“实现聚变能源——用于能源生产的球形托卡马克(STEP)”的一部分。